外墻保溫巖棉板作為達到防火等級A級的外墻外保溫無機材料巖棉,已經被廣泛運用,今天我來介紹一下使用巖棉板前的準備工作以及具備怎樣的條件。
Rock wool board for external wall insulation, as an inorganic rock wool material for external wall insulation that has reached fire rating A, has been widely used. Today I'd like to introduce the preparations and conditions before using rock wool board.
施工前準備:
Preparation before construction:
1.施工前,應根據設計和本規程要求以及相關的技術標準編制針對工程項目的節能保溫專項施工方案,并應對施工人員進行技術交底和專業技術培訓。
1. Before construction, the special construction scheme for energy conservation and insulation of the project shall be prepared according to the requirements of the design, this specification and relevant technical standards, and the construction personnel shall be provided with technical disclosure and professional technical training.
2.巖棉板外保溫系統用于節能保溫工程的施工應按照經審查合格的施工圖設計文件和經審批通過的用于工程項目的節能保溫專項施工方案進行。
2. The construction of rock wool board external insulation system used in energy-saving and insulation projects shall be carried out in accordance with the reviewed and qualified construction drawing design documents and the approved special construction scheme for energy-saving and insulation for engineering projects.
3.巖棉板外保溫系統的生產企業應有專業人員在施工過程中進行現場指導,并配合施工單位和現場監理做好施工質量控制工作。
3. The production enterprise of rock wool board external insulation system should have professionals to provide on-site guidance during the construction process, and cooperate with the construction unit and on-site supervisor to do a good job of construction quality control.
4.材料進場須按規格,數量和質量要求經過驗收合格才能入庫,并應有專人保管,嚴禁露天堆放。幕墻巖棉板應架空防潮堆放。
4. Materials entering the site must pass the acceptance according to the specification, quantity and quality requirements before entering the warehouse, and should be kept by a specially assigned person. It is strictly prohibited to stack in the open air. The rock wool board of curtain wall shall be stacked overhead against moisture.

Jinan rock wool board construction should meet the following conditions:
1.基層墻體及其水泥砂漿找平層處理及預埋件安裝完畢。
1. The treatment of base wall and its cement mortar leveling layer and the installation of embedded parts are completed.
2.必要的施工機具和勞防用品應已準備齊全。
2. Necessary construction machines and tools and labor protection supplies should be prepared.
3.施工專用腳手架應搭設牢固,安全檢驗合格。腳手架立桿與水平桿與墻面,墻角的間距應滿足施工要求。
3. Special scaffolds for construction shall be erected firmly and pass the safety inspection. The spacing between the upright and horizontal poles of the scaffold and the wall and the corner of the wall shall meet the construction requirements.
4.基層墻體應堅實平整,表面干燥,不得有開裂,空鼓,松動或泛堿,水泥砂漿找平層的粘結強度,平整度及垂直度應符合(建筑裝飾裝修工程質量驗收規范)GB50210中普通抹灰工程質量的要求。
4. The base wall shall be solid and flat, and the surface shall be dry, without cracking, hollowing, loosening or alkali flashing. The bonding strength, flatness and perpendicularity of the cement mortar leveling layer shall meet the requirements for the quality of ordinary plastering engineering in gb50210 (code for quality acceptance of Building Decoration Engineering).
What are the preparation and conditions for rock wool board before use? The above is the answer for you. If you need to buy or customize, please come to our website http://www.szbhys.com Consult.